Use cases · Project Managers
Ten ways project managers use Alloovium
The PM runs the job from the cockpit: schedule, cost, client, and team all land on your desk. These are the ten workflows PMs run in Alloovium every week — each with a short video showing the real thing.
Start the day ten miles ahead
The first fifteen minutes of a PM's day decide whether the day runs you or you run it. Todayopens on the week's calendar with planned site work pinned above the hours, the Needs attention queue on the right, and everything that moved overnight — emails classified, documents received, routines fired — already triaged below.
Instead of opening six tabs and an inbox of 80 unread, you scan one screen: what's due, what's waiting on you, and what changed. Anything that needs a decision is a click away from its source document.
Video · ~2 min
A PM's first fifteen minutes on Today
Opening Today at 6:45am — scanning the calendar spine with the pour pinned to Saturday, working the Needs-attention queue top to bottom, and clearing two approvals before the site call.
Prep the weekly meeting in minutes
Upload last week's recording — or record the meeting live — and Alloovium produces the meeting record: a PM-voice summary at the top, the full transcript beneath it, and the attendees identified from the conversation. Action items, decisions, variations, and risks are extracted with the verbatim quote each one came from, waiting in a review queue for you to approve or dismiss.
Walking into this week's meeting, you ask: “What did we agree last week and what's still open?”— and get a cited answer against the record, not someone's memory of it.
Video · ~2.5 min
From recording to meeting record
Uploading a 34-minute site coordination recording, opening the finished record — summary, transcript, attendees — then approving three extracted items from the review queue and watching them land on the project.
Answer the client with receipts
The client emails: “Why is the facade behind and what are you doing about it?” You ask the assistant the same question, scoped to the project. The answer comes back with numbered citations — the crane allocation decision from the meeting record, the panel delivery dates from the supplier correspondence, the recovery sequence from the lookahead.
Click any citation and the source opens with the passage highlighted. Share the conversation link with the client, or copy the cited answer into your reply — either way you're answering with the record, not a recollection.
Video · ~90 sec
A client question answered with citations
Typing the client's exact question into the project ask bar, the answer streaming in with citation chips, clicking through to the highlighted source, then sharing the conversation.
Catch a program landmine early
The blindside is the worst kind of delay: a long-lead item nobody re-checked, a sequencing clash two weeks out. The Lookahead keeps the next few weeks in one live view, and routines watch the record for the signals that precede a slip — a supplier email moving a delivery date, an RFI that gates a pour, a subcontractor going quiet.
When a schedule risk is flagged, it lands in Needs attention with the reason and the source — days before it would have surfaced at the weekly meeting.
Video · ~2 min
The landmine that didn't go off
A supplier email slips a delivery by nine days; the routine flags the clash against the lookahead, the PM opens the flag from Needs attention, reads the cited reasoning, and re-sequences before it costs float.
Turn a site instruction into a variation
The superintendent directs extra work on site. That instruction is money — but only if it becomes a variation with a price and a paper trail before everyone moves on. Ask Alloovium to raise the variation from the instruction: it drafts the scope from the directive, pulls the relevant contract clauses on valuation and notice, and starts the record that every later claim will lean on.
The variation lives on the project register with its status, value, and every linked document — so nothing directed on a Tuesday gets forgotten by claim day.
Video · ~2.5 min
Site instruction to variation in one sitting
Starting from a scanned site instruction, asking the assistant to raise the variation, reviewing the drafted scope and clause references, and saving it to the register with the instruction attached.
Chase deliverables automatically
Half of project management is following up: the SWMS that hasn't arrived, the shop drawings promised last Thursday, the unsigned subcontract. A routine watches for the reply — and if it doesn't come, drafts the chase, waits for your approval, and sends it. Every chase and every response is on the record.
You set it once in plain language: “Every morning, check whether Calabria have returned the signed subcontract — if not, chase them and copy me.”
Video · ~2 min
The routine that waits and chases
Creating a chase routine in plain language, the routine detecting no reply after two days, drafting the follow-up for approval, and the reply landing on the project record.
The monthly report without the weekend
The monthly report eats the last weekend of every month: progress, program, cost, safety, photos — assembled from a dozen sources. Alloovium drafts it from the project record: what was built (site diaries, meeting records), where the program sits (lookahead, flagged risks), where the money is (claims, variations register), grounded in the documents with citations you can check.
You review and edit a draft instead of assembling from scratch — and download it as DOCX in your company template.
Video · ~3 min
Drafting the monthly report from the record
Generating the monthly report, stepping through the drafted sections against their cited sources, editing the program narrative, and exporting the DOCX.
Onboard a new engineer in a day
A new engineer joins mid-job. Normally they spend three weeks reading — or worse, three months asking. Invite them to the project and they can question the entire document set from day one: the contract, the drawings, the meeting history, the correspondence.
“What are our notification obligations for latent conditions?” “Who approves shop drawings and how long do they have?” — every answer cited, so they learn the job from the record instead of interrupting yours.
Video · ~2 min
Day one on a new project
A new engineer accepting their invite, landing on the project, and asking their first five questions — each answer opening the source document they'd otherwise have spent a day finding.
Know what changed while you were away
Two weeks of leave means two hundred emails and a site that moved without you. The project Timeline holds every event — documents received, decisions logged, variations raised, claims moved, flags fired — in one stream. Ask for the summary: “What changed on this project in the last two weeks? What needs me first?”
You get the cited digest in minutes: what happened, what was decided, and the three things that actually need your attention — instead of archaeology through your inbox.
Video · ~2 min
Back from leave in twenty minutes
Opening the project timeline after two weeks away, asking for the what-changed digest, and clicking through the three flagged items that need a decision.
Escalate a delay with an evidence pack
When a delay becomes a claim, the difference between winning and wearing it is the evidence: the notices sent on time, the correspondence trail, the site records that show cause and effect. Ask for an evidence pack on the event and Alloovium assembles the chronology — every relevant document, dated and cited, in a structured bundle ready for the contract administrator or your lawyer.
Because the record was captured as it happened — meeting records, site diaries, emails filed to the project — the pack is built from facts, not reconstruction.
Video · ~2.5 min
Building the evidence pack
Requesting an evidence pack for a delay event, reviewing the assembled chronology with each entry citing its source document, and exporting the bundle.