Use cases · Site Managers
Ten ways site managers use Alloovium
The site manager runs the job from the ute and the deck, not a desk — and what changed on site has to reach the record before knock-off, or it never does. These are the ten workflows site managers run in Alloovium every week, each with a short video showing the real thing.
Phone the site diary in from the ute
The diary is the record that wins disputes — and the task that loses to knock-off every single day. Alloovium calls you: a scheduled call or SMS at the end of the shift, and the AI walks the diary questions — weather, labour on site, plant, materials, deliveries, incidents. Mention the crane breakdown mid-answer and wander off onto tomorrow's pour, and it captures both, then brings you back to the question it was asking.
By the time you're out of the car park, a structured site diary is on the project record — dated, complete, and searchable — instead of a promise to write it up tonight.
Video · ~2.5 min
The diary that calls you at knock-off
Taking the 4:30pm scheduled call in the ute, answering the diary questions with one off-track tangent about a late delivery, then opening the finished structured diary on the project record.
Check the detail against the current drawing
The formworker is asking about a detail and you're holding a print that might be two revisions old. Alloovium's drawing intelligence reads the title blocks and revision tables across the drawing set, so the register knows which revision of every sheet is current and what each issue changed.
From the phone: “Which revision of S-201 is current, and what changed between Rev C and Rev D?” — and the answer comes back with the revision notes and the sheet itself, before anyone builds off the wrong issue.
Video · ~90 sec
Two revisions, one truth
Asking the project ask bar which revision of a structural sheet is current, reading the cited what-changed answer, and opening the drawing to the revised detail.
What does the spec say about this pour?
The agitator is twenty minutes out and someone raises curing. The spec is a 400-page PDF on a laptop in the site office — or it's in your pocket. Ask the assistant, scoped to the project: “What does the spec require for curing this slab — and what's the test frequency?”
The answer streams back with numbered citations into the specification — curing method, tolerances, sampling rates — and one tap opens the clause with the passage highlighted. You're quoting the document at the deck, not recalling it.
Video · ~90 sec
The spec answers before the truck arrives
Asking the curing and test-frequency question from a phone on the deck, the cited answer streaming in, and tapping a citation to the highlighted spec clause.
Raise the RFI before it blocks the work
You've found a clash — the penetration lands on a beam and the drawings disagree. The old workflow is a photo on your phone, a mental note, and an RFI written from memory two days later. Instead: photograph the clash, dictate the question on the spot, and ask Alloovium to raise the RFI.
The RFI is drafted from your words, the photos attached, and it's logged on the project register with a number and a status — so the question is with the engineer before you've walked off the deck, and the crew isn't standing around waiting on it.
Video · ~2 min
From clash to logged RFI on the deck
Photographing a services clash, dictating the question into the assistant, reviewing the drafted RFI with the photos attached, and saving it to the register.
Know what's coming next fortnight
The crew works today; the site manager works two weeks ahead. The Lookaheadholds the next fortnight in one live view — the pours, the crane days, the inspections, the deliveries that gate them — with clashes and dependencies flagged while there's still time to move something.
When the scaffold strip lands on the same day as the facade delivery, the clash is flagged with the reason — days before the two crews meet at the hoist arguing about who was booked first.
Video · ~2 min
The fortnight in one view
Scrolling the lookahead across the next two weeks, opening a flagged sequencing clash between the scaffold strip and a delivery, and shifting the row before it costs a day.
Hold points before you cover it up
Nothing on a job is more expensive than pouring over a hold point. The ITP's hold and witness points are surfaced against the activity itself — before the reinforcement gets covered, you can see exactly which points apply, who has to witness them, and how much notice they're entitled to.
“What are the hold points before we pour the level 3 slab, and who needs to witness?”— the answer comes off the ITP with the notice periods cited, so the superintendent's representative is booked in time instead of being an excuse to stand the pour down.
Video · ~2 min
The hold point that didn't get poured over
Asking for the hold and witness points ahead of a slab pour, reading the cited ITP answer with witnesses and notice periods, and opening the ITP to the row.
The prestart that writes itself up
The toolbox talk happens every morning; the record of it happens sometimes. Record the prestart on your phone and Alloovium produces the meeting record — a summary at the top, the transcript beneath it, and the attendees identified from the conversation itself.
The actions raised — the missing edge protection, the exclusion zone for the crane lift — are extracted with the verbatim quote each came from and land in a review queue, so what was said at 6:30am becomes a record by smoko, not a memory by Friday.
Video · ~2.5 min
From toolbox talk to meeting record
Recording a morning prestart, opening the finished record with attendees identified from the conversation, and approving two extracted actions from the review queue.
Verify the delivery against the docket
The truck is on the gate, the driver wants a signature, and the docket says whatever it says. Photograph the docket and ask Alloovium to check it: quantity and spec against the purchase order, grade against what the drawings call up.
Short-delivered mesh or the wrong grade gets caught while the truck is still on site — not three weeks later in a payment dispute — and the delivery lands on the register with the docket attached, keeping the record current without a trip to the site office.
Video · ~90 sec
Checking the docket at the gate
Photographing a delivery docket, asking the assistant to verify quantity and spec against the order, catching a shortfall, and watching the delivery land on the register.
The latest revision, always
Every builder has a story about the wall built off the superseded drawing. Document control in Alloovium means a superseded sheet can't sneak onto the deck: when a new issue arrives, the old revision is superseded on the record, and every answer and every register points at the current issue.
Anyone on the crew can ask — “Give me the current issue of A-301” — and get the live sheet, not the one that was current when the print run happened. The drawing on the phone is the drawing of record.
Video · ~90 sec
The superseded drawing that never reached the deck
A revised architectural sheet arriving on the project, the old issue marked superseded on the register, then asking for the current issue from a phone and opening the live sheet.
Capture the lesson while it's fresh
The dearest knowledge on a job is the mistake you just paid for — and it usually walks off site in someone's head. While it's fresh, dictate what went wrong and why: the blockwork sequence that trapped the plumber, the pump that couldn't reach the far corner.
The lesson joins the company knowledge base, tagged to its trade and context — and on the next job, when the same situation is taking shape, it resurfaces where it's relevant instead of living in a spreadsheet nobody opens.
Video · ~2 min
The lesson that made the next job
Dictating a lesson from the ute after a blocked pour, reviewing the captured entry in the knowledge base, then seeing it resurface against a similar activity on another project.