Alloovium

Solutions · Safety & HSEQ

Catch it on the walk, not in the audit.

A non-conformance should be caught on the walk, not in a finding. Alloovium turns what you observe into tracked actions, and checks that your documents still agree, before a gap becomes a problem.

Site walk · Thursday 4:12 pm

One spoken note becomes a tracked list.

On the walk — hold to talk, hands stay free

Tag east face scaffold, third liftDRToday
Re-brief exclusion zone, loading bayTBFri
Housekeeping at stair coreMOFri
Update crane lift plan for L6 steelSGWed

Captured and assigned before the gate.

Before the finding

The gap, found before the auditor finds it

Scaffold and formwork on a rising concrete structure

What you see becomes an action item. Capture it by voice or a quick note as you go. Each observation is assigned and tracked, with no write-up back at the desk.

Rows of freight wagons in a rail yard from directly above

Your documents, swept for disagreement. Specs, drawings, ITPs and RFIs are cross-checked so a conflict is caught before it reaches site or an audit.

A completed industrial facility and its clean surrounds from the air

The record keeps itself clean. Every observation and flagged conflict is tracked to close, so the register is defensible when the audit comes around.

Conformance, continuously

From a point-in-time scramble to protection that holds

The audit stops being the moment you find out. The system watches the documents and the actions between audits.

  • On a site walk you record each hazard or observation as you go, by voice or a quick note. Every one becomes an assigned, tracked action item.

    Site walk · Thursday 4:12 pm

    One spoken note becomes a tracked list.

    On the walk — hold to talk, hands stay free

    Tag east face scaffold, third liftDRToday
    Re-brief exclusion zone, loading bayTBFri
    Housekeeping at stair coreMOFri
    Update crane lift plan for L6 steelSGWed

    Captured and assigned before the gate.

  • Alloovium sweeps the specs, drawings, ITPs and RFIs and flags where they no longer agree, so a non-conformance is caught before it is built in.

    Conformance sweep · overnight

    Every document read, checked against the revision Exchange says is current

    PDFITP — L4 slab
    PDFWPS-03 weld procedure
    DWGDrawing S-402 rev C
    DOCXSWMS 014
    PDFPour card — L4 slab

    128 of 128 read

    ITP — L4 slabSpec 03 30 00queuedAligned
    9 hold points read · match spec §3 test regime
    WPS-03 weld procedureAS/NZS 1554.1queuedAligned
    weld class SP · consumables per table 4.6.1
    Drawing S-402 rev CDetail libraryqueuedSuperseded detail
    detail 5 cites rev B — the library holds rev D
    SWMS 014Review schedulequeuedOverdue 6 days
    last review 14 May — the cycle is 3-monthly
    Pour card — L4 slabHold point registerqueuedSigned
    hold point #14 signed · geotech report attached

    2 gaps · assigned before start of day. 126 of 128 documents read and aligned overnight.

    DWRMon it before the 7:30 prestart
  • Every observation and flagged conflict is assigned and chased to close, so the record is clean and defensible when the audit comes around.

    HSEQ register · Meridian Tower

    Distribution and acknowledgement, on the record

    NCR-031Verification attached, pour card L312 JunClosed
    OBS-112Scaffold ties, east faceTodayAcknowledged
    OBS-108Recurring hazard, stair core19 JunEscalated
    NCR-030Formwork rectified, L3 slab edge9 JunVerified
    OBS-104Edge protection, L5 void2 JunClosed

    100% acknowledged · on the record

  • Plug your existing system in and get a live gap analysis against your ISO accreditation, with a to-do list of exactly where you fall short, instead of finding out at the audit.

    Gap analysis · ISO 9001

    Your system, read clause by clause

    7.1.5Calibration registerIncomplete
    7.2Competency recordsCovered
    7.5Document control procedureCovered
    8.7Nonconforming outputsCovered
    9.2Internal audit programmeCovered
    9.3Management review cadenceNot evidenced
    42 of 45 clauses evidenced

    The to-do list lands before the auditor does

How it works

From a site walk to a clean audit

01Capture what you see

On a site walk the safety manager records each hazard or observation as they go, by voice or a quick note, with no write-up at the desk afterwards.

Site walk · Thursday 4:12 pm

One spoken note becomes a tracked list.

On the walk — hold to talk, hands stay free

Tag east face scaffold, third liftDRToday
Re-brief exclusion zone, loading bayTBFri
Housekeeping at stair coreMOFri
Update crane lift plan for L6 steelSGWed

Captured and assigned before the gate.

02Documents are cross-checked

Alloovium sweeps the specs, drawings, ITPs and RFIs and flags where they no longer agree, so a non-conformance is caught before it is built in.

Conformance sweep · overnight

Every document read, checked against the revision Exchange says is current

PDFITP — L4 slab
PDFWPS-03 weld procedure
DWGDrawing S-402 rev C
DOCXSWMS 014
PDFPour card — L4 slab

128 of 128 read

ITP — L4 slabSpec 03 30 00queuedAligned
9 hold points read · match spec §3 test regime
WPS-03 weld procedureAS/NZS 1554.1queuedAligned
weld class SP · consumables per table 4.6.1
Drawing S-402 rev CDetail libraryqueuedSuperseded detail
detail 5 cites rev B — the library holds rev D
SWMS 014Review schedulequeuedOverdue 6 days
last review 14 May — the cycle is 3-monthly
Pour card — L4 slabHold point registerqueuedSigned
hold point #14 signed · geotech report attached

2 gaps · assigned before start of day. 126 of 128 documents read and aligned overnight.

DWRMon it before the 7:30 prestart

03Actions are tracked to close

Every observation and flagged conflict becomes an assigned, tracked action, so the record is clean and defensible when the audit comes around.

HSEQ register · Meridian Tower

Distribution and acknowledgement, on the record

NCR-031Verification attached, pour card L312 JunClosed
OBS-112Scaffold ties, east faceTodayAcknowledged
OBS-108Recurring hazard, stair core19 JunEscalated
NCR-030Formwork rectified, L3 slab edge9 JunVerified
OBS-104Edge protection, L5 void2 JunClosed

100% acknowledged · on the record

Get started

The document intelligence platform your team needs.

Put every drawing, spec, contract and RFI to work — and let the monthly grind run itself.

A construction engineer reviewing drawings and a schedule from a site office overlooking live towers