Alloovium

Platform · Prove

The audit trail writes itself.

ITPs, hold points, obligations and non-conformances tracked to close against your own management system, so the evidence exists before the auditor asks.

Conformance sweep · overnight

Checked against the revision Exchange says is current

ITP — L4 slabSpec 03 30 00checking…Aligned
WPS-03 weld procedureAS/NZS 1554.1checking…Aligned
Drawing S-402 rev CDetail librarychecking…Superseded detail
SWMS 014Review schedulechecking…Overdue 6 days
Pour card — L4 slabHold point registerchecking…Signed

2 gaps · assigned before start of day. 123 of 128 documents aligned overnight.

DWRMon it before the 7:30 prestart
01

Obligations read from your own contracts and specs

02

Hold points and ITPs tracked to close

03

Evidence attached where the auditor will look

What it does

Compliance as a by-product of the work

HSEQ register — Meridian Tower
ITP — L4 slab pourDW8 JulClosed
NCR-012 · concrete test cubeRM2 JulClosed
1Test cert 4411 · 5 Jul
Hold point — L4 pour witnessTW6 JulWitnessed
SWMS 014 · crane ops reviewJC12 JulCurrent
Calibration — auto level 09MP19 JulClosed
Induction — night crewSK15 JulCurrent
0 unowned · 0 overdue

The register that stays current

Every obligation, NCR and observation tracked with an owner and a close-out date. Nothing lives in a spreadsheet nobody opens.

Gap analysis — ISO 9001

Your system, read clause by clause

7.5Document controlCovered
8.7Nonconforming outputsCovered
9.3Management reviewNot evidenced
7.1.5Calibration registerIncomplete
7.2Competency recordsCovered
9.2Internal audit programmeCovered
42 of 45 clauses evidenced
2 items · ranked and assigned

Minute the June management review — due before audit

The to-do list lands before the auditor does.

Gaps found before the audit

Your management system read against the standard, with the gaps listed and the to-do ranked. The auditor finds a system that already checked itself.

Morning handoff · 7:00 AM
ITP — L4 slabSpec 03 30 00Aligned
S-402 rev CDetail librarySuperseded detail
SWMS 014Review scheduleOverdue 6 days
Pour card — L4 slabHold point registerSigned

2 gaps · assigned before start of day

DWRMon it before the 7:30 prestart

It checked itself while you slept.

Documents that agree with each other

The overnight sweep cross-checks ITPs against specs and drawings against the current revision, and flags what drifted.

How it works

01

Load the obligations

Read from your contracts, specs and management system. Nothing re-keyed.

02

Track the work

Hold points, ITPs and actions close out with evidence attached as the job runs.

03

Walk into the audit ready

The trail is already written, cited and exportable.

Get started

The document intelligence platform your team needs.

Put every drawing, spec, contract and RFI to work — and let the monthly grind run itself.

A construction engineer reviewing drawings and a schedule from a site office overlooking live towers