Design change email to RFI

A design change buried in a consultant thread becomes a flagged card, a pre-filled RFI and a filed record, before the trade builds the detail that quietly moved.

Site walk · Thursday 4:12 pm

One spoken note becomes a tracked list.

“”On the walk — hold to talk, hands stay free

Tag east face scaffold, third liftDRToday
Re-brief exclusion zone, loading bayTBFri
Housekeeping at stair coreMOFri
Update crane lift plan for L6 steelSGWed

Captured and assigned before the gate.

01Design-change emails flagged as they land
02The RFI intake pre-filled from the thread
03Nothing raised until you confirm it

Watch it work

From a consultant email to a filed, cited RFI in under ten minutes.

01 · Flag

The change is flagged before triage

The email is classified as a design change, the affected drawing is named, and the card shows the exact sentence it came from, waiting in your morning triage with where it came from.

Site walk · Thursday 4:12 pm

One spoken note becomes a tracked list.

“”On the walk — hold to talk, hands stay free

Tag east face scaffold, third liftDRToday
Re-brief exclusion zone, loading bayTBFri
Housekeeping at stair coreMOFri
Update crane lift plan for L6 steelSGWed

Captured and assigned before the gate.

02 · Confirm

The intake arrives pre-filled

Project, discipline, drawing reference, question and requested-by date pre-fill from the thread and the register, each field showing its source. You edit the question and confirm; nothing is raised automatically.

VAR-014 · rock excavation, SW trench

Friday’s diary note becomes a cited claim

TriggerReading Friday’s diary…Rock at 2.0m, SW trench — site diary, 26 Jun
BasisMatching contract clauses…Latent condition — cl 25.2, AS 4000
ValueTallying the cost register…$104,800 · +6 days, EOT-007 linked
Notice

1Geotech BH-042Site diary 26 Jun3Survey + daywork sheetsEvery figure cited

Drafted tonight — the time bar holds. Notice due Fri 5 Jul, inside the 5-day bar · 3 citations attached.

03 · Close

Filed, and answerable later

The RFI files with its paper trail. When the crew asks about the detail on Thursday, the chat answer cites the filed RFI and the current revision.

Ask · Meridian Tower

Ask in plain language, get the cited answer

What cover does the spec require for the ground slab reinforcement?

The spec requires 40mm cover to the top face and 50mm cast against ground [1]. Drawing S-201 rev D notes the lift pit as the exception at 65mm [2].

1 Spec 03 30 00 — p.442 S-201 rev D

Before and after

From a buried change to a raised RFI

Today

  • The design change sits three replies deep until someone notices.
  • The register still shows the superseded detail.
  • The RFI is worded in a hurry and comes back with a question.
  • A month later, nobody remembers where the change was agreed.

With Alloovium

  • The change is a flagged card before morning triage.
  • The intake pre-fills from the thread, every field cited.
  • You confirm the wording; the draft cites the email and the drawing.
  • Ask in chat later and the answer cites the filed RFI.

What it draws on

Grounded in the records you already keep

Every answer, draft and check reads from the project’s own paper trail. Nothing is uploaded twice, and nothing is invented.

  • Meeting minutesDecisions and actions, traced to the meeting they came from.
  • Site walks & diariesThe day’s record, spoken or typed, filed as it happens.
  • Emails & correspondenceThe thread where the instruction actually lives.
  • Drawings & specificationsEvery revision, read down to the clause and the detail.
  • Registers & ITPsQuantities, holds and sign-offs as structured records.
  • Contracts & variationsEntitlements and notices, cited back to the clause.

Get started

The document intelligence platform your team needs.

Put every drawing, spec, contract and RFI to work — and let the monthly grind run itself.