Alloovium

Solutions · Commercial Managers

Get paid for every change.

The entitlement is usually there. It gets lost between the site note that proved it and the notice that was due last Tuesday. Alloovium reads the contract, watches the windows and drafts the claim.

VAR-014 · rock excavation, SW trench

Friday’s diary note becomes a cited claim

TriggerReading Friday’s diary…Rock at 2.0m, SW trench — site diary, 26 Jun
BasisMatching contract clauses…Latent condition — cl 25.2, AS 4000
ValueTallying the cost register…$104,800 · +6 days, EOT-007 linked
Notice

1Geotech BH-042Site diary 26 Jun3Survey + daywork sheetsEvery figure cited

Drafted tonight — the time bar holds. Notice due Fri 5 Jul, inside the 5-day bar · 3 citations attached.

The commercial position

The contract, the change and the claim, in one place

High-rise towers on a live construction skyline at golden hour

The contract, read to the clause. Ask what you signed up to and get the answer with the clause it came from, instead of re-reading two hundred pages on a Friday night.

Aerial view of earthworks plant cutting a haul road

Every register, one question away. The variation register, the subbie claims and the correspondence all answer in plain language, cited back to the document.

A completed industrial facility and its clean surrounds from the air

The notice goes in before the bar. The change is captured the day it happens, matched to its clause, and the window is watched so the claim is lodged while it is still worth full value.

Entitlement, protected

From the site record to the lodged claim

You are not buying easier admin. You are buying claims that go in on time, substantiated from what actually happened on site.

  • Tell it what changed. It asks the prompting questions it needs, then drafts the variation in your own contract wording, ready to review and lodge before it is time-barred.

    VAR-014 · rock excavation, SW trench

    Friday’s diary note becomes a cited claim

    TriggerReading Friday’s diary…Rock at 2.0m, SW trench — site diary, 26 Jun
    BasisMatching contract clauses…Latent condition — cl 25.2, AS 4000
    ValueTallying the cost register…$104,800 · +6 days, EOT-007 linked
    Notice

    1Geotech BH-042Site diary 26 Jun3Survey + daywork sheetsEvery figure cited

    Drafted tonight — the time bar holds. Notice due Fri 5 Jul, inside the 5-day bar · 3 citations attached.

  • Every captured change is matched to the clause that governs it, and its notice window is watched from that moment, so nothing lapses because month-end got busy.

    Claims register · GC21

    Watched against the notice periods

    VAR-014Rock excavation, SW trench$104,8003 days left
    EOT-007Wet weather, June+6 daysDrafted
    VAR-012L2 design change$61,200Submitted
    VAR-009Services clash, ceiling grid L1$18,450Submitted
    EOT-005Latent conditions, basement+4 daysApproved

    VAR-014 notice due in 3 days under GC21 cl 14.2 — the draft is already in your review queue.

    Watched to the time bar — nothing lapses quietly
  • When a new contract or spec revision lands, Alloovium shows you exactly which clauses moved, so an amended notice period or LD rate never slips through unread.

    Head Contract — GC21 · Exchange

    The revision performs itself as a redline

    Comparing rev C → rev D…Rev C → rev D · 3 clauses changed
    Cl 14.2 — Extension of time, notice period
    …written notice within 21 days of the delay first arising.
    …written notice within 7 days of the delay first arising.
    Cl 42.7 — Liquidated damages
    …at the rate of $8,500 per day or part thereof.
    …at the rate of $12,000 per day or part thereof.
    Cl 6.1 — Scope of works · unchanged
    JTPNMW3 of 4 subcontractors acknowledgedAudit trail on file
  • The progress claim you assemble every month becomes a routine that drafts itself from your registers and site records, with a review step before anything is lodged.

    End-of-month report · routine

    Nothing goes out until you have reviewed it

    June progress reportRuns 1st · 6:00amQueuedRunning…In reviewSentRun now
    Pull site diaries and registers62 documents
    Tally claimed quantitiesFrom the cost register
    Draft the monthly reportSection 5 of 5 · $412,300
    Send to you for reviewTo you · 6:00am
    Assembling from the registers…Nothing goes out until you approve itSent to the client list · 6:04amApproved

    Sent · 6:04am — after your approval. June report to the client list · 28s · run 12 of 12 succeeded.

How it works

From a site note to a lodged claim

01The contract is read to the clause

Alloovium reads the head contract and subcontracts when they land, so every notice period, entitlement and time bar is on record from day one.

Head Contract — GC21 · Exchange

The revision performs itself as a redline

Comparing rev C → rev D…Rev C → rev D · 3 clauses changed
Cl 14.2 — Extension of time, notice period
…written notice within 21 days of the delay first arising.
…written notice within 7 days of the delay first arising.
Cl 42.7 — Liquidated damages
…at the rate of $8,500 per day or part thereof.
…at the rate of $12,000 per day or part thereof.
Cl 6.1 — Scope of works · unchanged
JTPNMW3 of 4 subcontractors acknowledgedAudit trail on file

02The change is matched to its clause

A change captured on site, by voice note or diary entry, is matched to the clause that governs it, and the notice window is watched from that moment.

Claims register · GC21

Watched against the notice periods

VAR-014Rock excavation, SW trench$104,8003 days left
EOT-007Wet weather, June+6 daysDrafted
VAR-012L2 design change$61,200Submitted
VAR-009Services clash, ceiling grid L1$18,450Submitted
EOT-005Latent conditions, basement+4 daysApproved

VAR-014 notice due in 3 days under GC21 cl 14.2 — the draft is already in your review queue.

Watched to the time bar — nothing lapses quietly

03The claim is drafted and chased

The variation or EOT comes back drafted in your own wording, substantiated from the site record, and chased until it is lodged or closed.

VAR-014 · rock excavation, SW trench

Friday’s diary note becomes a cited claim

TriggerReading Friday’s diary…Rock at 2.0m, SW trench — site diary, 26 Jun
BasisMatching contract clauses…Latent condition — cl 25.2, AS 4000
ValueTallying the cost register…$104,800 · +6 days, EOT-007 linked
Notice

1Geotech BH-042Site diary 26 Jun3Survey + daywork sheetsEvery figure cited

Drafted tonight — the time bar holds. Notice due Fri 5 Jul, inside the 5-day bar · 3 citations attached.

Get started

The document intelligence platform your team needs.

Put every drawing, spec, contract and RFI to work — and let the monthly grind run itself.

A construction engineer reviewing drawings and a schedule from a site office overlooking live towers