Walk the site. The paperwork writes itself.

The site manager sees the day’s changes first, and most of them never make it back to the office. A short call at knock-off captures what changed and has the write-up drafted by the time you are back.

Knock-off call · 4:30 pm daily

Two minutes on the drive — the diary writes itself.

Zander · on the drive to the gateCall ended · filed to the diary1:42
Alloovium

Anything change against the programme today?

Zander

Yeah — hit rock in the SW trench about two metres down. Geotech said clay.

Alloovium

Noted — that reads like a latent condition against BH-04. I’ll write the diary.

Diary draftingVariation flaggedListening

Every knock-off call files itself — 14 diaries this month.

From the field

The day, captured before it walks off site

Earthworks plant working a cut on a civil site

Talk it through the way you’d brief your PM. A short call at knock-off walks your day. No typing, no form, no laptop in the ute.

Formwork and falsework on a rising concrete frame

Stop trawling drawings and specs. Ask the question in plain language and get the answer back, cited to the sheet and clause it came from.

Rows of rail wagons in a marshalling yard from above

Every change becomes the right record. Variations, RFIs and diary entries come back drafted for review, with a recap so nothing is lost on the drive back.

Speak it once

From a knock-off call to drafted paperwork

The change starts as something you notice on the walk. Alloovium keeps it that simple and does the write-up.

  • At a time you set, or whenever it suits, Alloovium rings you for a two minute walk-through of what happened on site that day.

    Knock-off call · 4:30 pm daily

    Two minutes on the drive — the diary writes itself.

    Zander · on the drive to the gateCall ended · filed to the diary1:42
    Alloovium

    Anything change against the programme today?

    Zander

    Yeah — hit rock in the SW trench about two metres down. Geotech said clay.

    Alloovium

    Noted — that reads like a latent condition against BH-04. I’ll write the diary.

    Diary draftingVariation flaggedListening

    Every knock-off call files itself — 14 diaries this month.

  • You talk through it the way you would brief your PM. Alloovium turns what you say into variations, RFIs and diary entries, each tracked back to the job.

    Knock-off call · 4:30 pm daily

    Two minutes on the drive — the diary writes itself.

    Zander · on the drive to the gateCall ended · filed to the diary1:42
    Alloovium

    Anything change against the programme today?

    Zander

    Yeah — hit rock in the SW trench about two metres down. Geotech said clay.

    Alloovium

    Noted — that reads like a latent condition against BH-04. I’ll write the diary.

    Diary draftingVariation flaggedListening

    Every knock-off call files itself — 14 diaries this month.

  • Variations and RFIs come back drafted in your own wording, and you get a text recap of everything raised, ready to review and send from the web.

    VAR-014 · rock excavation, SW trench

    Friday’s diary note becomes a cited claim

    TriggerReading Friday’s diary…Rock at 2.0m, SW trench — site diary, 26 Jun
    BasisMatching contract clauses…Latent condition — cl 25.2, AS 4000
    ValueTallying the cost register…$104,800 · +6 days, EOT-007 linked
    Notice

    1Geotech BH-042Site diary 26 Jun3Survey + daywork sheetsEvery figure cited

    Drafted tonight — the time bar holds. Notice due Fri 5 Jul, inside the 5-day bar · 3 citations attached.

  • A few sentences captured each day builds the record as you go, so a delay claim is substantiated from what actually happened, not reconstructed weeks later.

    Site diary · Tuesday 24 June

    The knock-off call writes the diary.

    07:00NE slab poured and passed — 46m³, pump on site 6:15am.Logged
    13:10Storm from 1pm — two crews stood down, crane on hold.Noted
    15:40SW trench: rock at 2.0m — not in Geotech BH-04 log.NotedLatent · BH-04
    16:30Reo for L5 received, stacked at gate 3 laydown.Logged

    Filed 5:04pm — a 1:42 call, no typing.

    Variation drafted from the 15:40 entry

See it work

Two minutes at the gate, written up

This is the Friday call, simulated end to end: the update spoken the way you’d brief your PM, and the paperwork drafting itself while you talk.

The Friday call

Two minutes at the gate, and the paperwork drafts itself.

While you talk, it drafts

0/6

  • Listening to the call
  • Drafting diary entriesDIARY-114DIARY-115

    NE slab poured, passed inspection. Storm at 1pm, two crews stood down.

  • Checking the documents

    Rock at 2m is not in the bore logs. Reading the latent conditions clause.

    Geotech_Report_BH-04.pdf

    GC21_Contract_rev_D.pdf

    2 more files

  • Variation flaggedVAR-014

    Rock at 2m, SW trench. Possible latent condition, evidence attached.

  • Notice clock startedNOT-003

    Latent condition. Notice due in 5 business days.

  • Routed to the PM

    Pinned to Pete’s Monday with sources attached.

Monday morning, the flagged variation sits at the top of the PM’s list with the notice clock running, cited to the contract and the geotech report.

Get started

The document intelligence platform your team needs.

Put every drawing, spec, contract and RFI to work — and let the monthly grind run itself.

A construction engineer reviewing drawings and a schedule from a site office overlooking live towers