Alloovium
Use case · WatchAvailable

Compliance oversight

Every credential, ticket and record is watched, so an expired licence or a missing sign-off surfaces before an audit, not in one.

HSEQ register · Meridian Tower

Distribution and acknowledgement, on the record

NCR-031Verification attached, pour card L312 JunClosed
OBS-112Scaffold ties, east faceTodayAcknowledged
OBS-108Recurring hazard, stair core19 JunEscalated
NCR-030Formwork rectified, L3 slab edge9 JunVerified
OBS-104Edge protection, L5 void2 JunClosed

100% acknowledged · on the record

01Every credential and record tracked
02Flags what is expiring or missing
03Surfaced before the audit, not in it

Watch it work

The records you already hold are watched for what is about to lapse, so the gap surfaces while there is still time to fix it.

01 · Read

Reads the records you hold

Credentials, inductions, ITPs and sign-offs are read from your project files, not tracked by hand on a spreadsheet.

HSEQ register · Meridian Tower

Distribution and acknowledgement, on the record

NCR-031Verification attached, pour card L312 JunClosed
OBS-112Scaffold ties, east faceTodayAcknowledged
OBS-108Recurring hazard, stair core19 JunEscalated
NCR-030Formwork rectified, L3 slab edge9 JunVerified
OBS-104Edge protection, L5 void2 JunClosed

100% acknowledged · on the record

02 · Flag

Flags what is lapsing

What is expired, expiring soon or missing is flagged against the requirement it belongs to, before it becomes a stop-work.

Gap analysis · ISO 9001

Your system, read clause by clause

7.1.5Calibration registerIncomplete
7.2Competency recordsCovered
7.5Document control procedureCovered
8.7Nonconforming outputsCovered
9.2Internal audit programmeCovered
9.3Management review cadenceNot evidenced
42 of 45 clauses evidenced

The to-do list lands before the auditor does

03 · Surface

Surfaced before it bites

The gap lands on your Today view with time to act, so it is closed out ahead of the audit instead of found in it.

Site walk · Thursday 4:12 pm

One spoken note becomes a tracked list.

“”On the walk — hold to talk, hands stay free

Tag east face scaffold, third liftDRToday
Re-brief exclusion zone, loading bayTBFri
Housekeeping at stair coreMOFri
Update crane lift plan for L6 steelSGWed

Captured and assigned before the gate.

Before and after

From found in the audit to closed out before it

Today

  • Expired tickets and missing sign-offs go unnoticed until an audit.
  • What is current lives across folders and inboxes.
  • The gap is only obvious once a crew is stood down.

With Alloovium

  • Every credential and record is watched for what is about to lapse.
  • Gaps are flagged against the requirement they belong to.
  • The problem surfaces with time to fix it, before the audit.

What it draws on

Grounded in the records you already keep

Every answer, draft and check reads from the project’s own paper trail. Nothing is uploaded twice, and nothing is invented.

  • Meeting minutesDecisions and actions, traced to the meeting they came from.
  • Site walks & diariesThe day’s record, spoken or typed, filed as it happens.
  • Emails & correspondenceThe thread where the instruction actually lives.
  • Drawings & specificationsEvery revision, read down to the clause and the detail.
  • Registers & ITPsQuantities, holds and sign-offs as structured records.
  • Contracts & variationsEntitlements and notices, cited back to the clause.

Get started

The document intelligence platform your team needs.

Put every drawing, spec, contract and RFI to work — and let the monthly grind run itself.

A construction engineer reviewing drawings and a schedule from a site office overlooking live towers