Handover & Closeout
Practical completion, O&M manuals, as-builts, warranties and defects liability.
- How do I assemble a handover document pack?
- How do I close out defects before handover?
- How do I compile warranties for project handover?
- How do I manage the defects liability period after handover?
- How do I prepare as-built documentation?
- What certificates are required at practical completion?
- What goes into an O&M manual?
- What is required for construction project handover?