Most defects and disputes trace back to a conflict between two documents no one noticed. Alloovium finds them before they leave the office.
Specification requires 25-year waterproofing warranty. Head contract limits contractor warranty to 10 years.
Drawing A-101 Rev D contradicts A-201 Rev B on column grid setout at Grid C. Rev B is superseded.
Hydraulic drawings reference sewer pump station. Neither architectural nor civil drawings show this element.
What Conflict does
Alloovium scans across drawings, specifications, contracts, and RFIs simultaneously — flagging contradictions between any two documents before they reach the site.
[IMAGE: Split-screen showing spec clause and conflicting drawing annotation, with conflict highlight overlay]
Conflicts are ranked by commercial and programme impact — so your team focuses on what matters first.
[IMAGE: Priority list UI — High / Medium / Low conflicts with counts]
Automatically detects when a drawing revision creates a conflict with a previously consistent document.
[IMAGE: Version diff view — Rev B vs Rev C with change highlights]
Turn any detected conflict into a drafted RFI in one click — with the conflicting references pre-filled.
[IMAGE: RFI draft form pre-filled from conflict detection]
Every conflict detected, reviewed, and resolved is logged — giving you a defensible record of how ambiguities were identified and addressed throughout the project.
[IMAGE: Conflict log table with status, resolution, and responsible party columns]
[VIDEO: 60-second demo — uploading drawing set, conflict scan running, conflicts surfaced with citations, one-click RFI draft]
Book a demo and run Conflict on your own document set.
Book a demo