How do I set up a document control system on a project?
Last reviewed July 5, 2026
Start by defining a clear folder structure for your documents. Use consistent naming conventions and version control. Set access levels for team members. Regularly review and update documents to keep them current. Track changes and ensure everyone knows where to find the latest versions.
Key points
- Define folder structure
- Use consistent naming conventions
- Set access levels for team members
- Regularly review and update documents
A solid document control system helps keep everything organised and prevents confusion. Make sure all team members know the process for uploading and accessing documents. A good setup saves time and reduces mistakes on site.
How Alloovium helps
Alloovium can help you track documents, manage versions, and pull data from PDFs easily.
See how it worksRelated questions
- How do I avoid building from a superseded drawing?
- How do I cross-reference a specification against a drawing?
- How do I extract data from construction submittals automatically?
- How do I find information across thousands of project PDFs?
- How do I make sure the site is using the latest drawings?
- How do I manage drawing revisions on site?
General information for Australian construction professionals — not legal advice. Verify jurisdiction-specific requirements with the relevant regulator.