How do I make sure the site is using the latest drawings?
Last reviewed July 5, 2026
Check with the design team for updates often. Keep a log of revision dates on each drawing. A document management system helps track changes and notifies the team about new versions.
Key points
- Check with the design team for updates.
- Log revision dates on each drawing.
- A document management system tracks changes.
Having a system helps everyone know they're working from the latest drawings. Regular chats with the design team catch updates before they affect the project. A solid document management system keeps everything organized and alerts team members when changes occur.
How Alloovium helps
Alloovium tracks drawing revisions and notifies you when updates happen.
See how it worksRelated questions
- How do I avoid building from a superseded drawing?
- How do I cross-reference a specification against a drawing?
- How do I extract data from construction submittals automatically?
- How do I find information across thousands of project PDFs?
- How do I manage drawing revisions on site?
- How do I organise project documents for handover?
General information for Australian construction professionals — not legal advice. Verify jurisdiction-specific requirements with the relevant regulator.