Every spec, drawing, RFI, and contract on your project — read, understood, and cross-checked. Catch contradictions before they hit site. Find any answer in seconds. Cited back to the exact page.
What we build
Alloovium Assistant
Reading 2,841 documents
What's the concrete grade spec for the slab?
9:42 AM
32 MPa at 28 days per Spec Section 03.30, with 100mm slump and 20mm aggregate.
Cited sources
Spec-Section-03.30p.14Drawing-S-04Intelligence
Ask anything across your project documents. Get cited answers in seconds — with the exact clause, drawing, or spec to back it up.
Head Contract · Filling
4 of 4 fields · auto-filled
Contract Sum
$12,450,000
Practical Completion
14 Mar 2025
Defects Liability
12 months
Concrete Grade
32 MPa @ 28 days
Workflows
Auto-fill templates, contracts, and compliance docs straight from your project data. No copy-pasting. No hunting through folders.
Connected sources
5,128 documents · synced 2m ago
SharePoint
2,841 documents
Procore
14 active projects
Aconex
1,204 transmittals
Outlook
518 emails
HammerTech
87 inspections
Google Drive
464 files
Integrations
Connect SharePoint, Procore, Google Drive, and more. Every document synced automatically — one searchable intelligence layer across all your sources.
The bigger picture
Built for the engineers and PMs who actually deliver projects — not the ones who present on them.

Across the suite

February 2026
Alloovium selected for Startmate Summer ’26 — Australia’s leading accelerator

March 2026
Building smarter from the ground up — in conversation with Zander Schweitzer, Alloovium

January 2026
Copy. Paste. Ctrl+F. Replace. Submit. That’s the old way — introducing Alloovium

February 2026
5 minutes — that’s how long it takes Alloovium to save a project manager hours every week
