How do I create a compliant as-built drawing in the ACT?

Last reviewed July 5, 2026

Get the final measurements and any changes from the site. Update your drawings to reflect what's actually built. Include notes on materials, finishes, and any deviations from the original plans. Make sure it's signed off by the site supervisor and keep it on file for compliance checks.

Key points

  • Final measurements reflect actual build.
  • Include changes and deviations from plans.
  • Get sign-off from the site supervisor.

As-built drawings show the actual construction details as built on site, not just what was planned. In the ACT, it's essential to keep these accurate for compliance and future reference. They're often needed for inspections or audits, so make sure they're thorough and up to date.

How Alloovium helps

Alloovium can help you track changes and manage compliance documents easily.

See how it works

Related questions

General information for Australian construction professionals — not legal advice. Verify jurisdiction-specific requirements with the relevant regulator.