How do I close out a hold point?
Last reviewed July 5, 2026
To close out a hold point, check that all required inspections and tests are complete. Document the results and get sign-off from the relevant parties, like the super and the client rep. Finally, update your records to reflect the closure and any conditions that were met.
Key points
- Verify all inspections and tests are done.
- Get sign-off from the super and client rep.
- Document everything in the project records.
Hold points are critical checks in the build process. You can't proceed until they're closed out. Make sure you've got all the paperwork sorted, including any test results and inspection reports. Keep everyone in the loop to avoid delays.